Triple

T21306822
Position Surface form Disambiguated ID Type / Status
Subject Boca Reservoir E525218 entity
Predicate impoundedBy P10781 FINISHED
Object Boca Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boca Dam | Statement: [Boca Reservoir, impoundedBy, Boca Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boca Dam
Context triple: [Boca Reservoir, impoundedBy, Boca Dam]
  • A. Boca Dam chosen
    Boca Dam is an earthfill dam in Nevada County, California, that creates Boca Reservoir on the Little Truckee River for water storage, flood control, and recreation.
  • B. Barker Dam
    Barker Dam is a historic water reservoir and popular scenic spot located within Joshua Tree National Park in California.
  • C. Holcombe Dam
    Holcombe Dam is a hydroelectric and flood-control dam on the Chippewa River in Wisconsin, forming Lake Holcombe and supporting regional recreation and power generation.
  • D. Madden Dam
    Madden Dam is a major concrete gravity dam in Panama that helps regulate the flow of the Chagres River and supplies water for the Panama Canal and hydroelectric power generation.
  • E. Sweetwater Dam
    Sweetwater Dam is a historic masonry gravity dam in San Diego County, California, built in the late 19th century to provide water storage and flood control for the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b518b8948190ad69cf9a8784d397 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e75aa69b40819081e74c042e7cd105 completed April 21, 2026, 11:08 a.m.
Created at: April 16, 2026, 4:05 p.m.