Triple

T21306267
Position Surface form Disambiguated ID Type / Status
Subject Fiat A.80 E525205 entity
Predicate usedOnAircraft P10706 FINISHED
Object Fiat BR.20 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fiat BR.20 | Statement: [Fiat A.80, usedOnAircraft, Fiat BR.20]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fiat BR.20
Context triple: [Fiat A.80, usedOnAircraft, Fiat BR.20]
  • A. Fiat BR.2
    The Fiat BR.2 was an Italian biplane bomber of the 1920s designed by aeronautical engineer Celestino Rosatelli for the Regia Aeronautica.
  • B. Fiat BR.20 Cicogna chosen
    The Fiat BR.20 Cicogna was an Italian twin‑engine medium bomber of the 1930s and World War II, notable as one of Italy’s first all‑metal bombers and used extensively in early war campaigns.
  • C. Fiat G.12
    The Fiat G.12 was an Italian three-engined transport aircraft of the World War II era, used primarily for military and civilian passenger and cargo operations.
  • D. Fiat CR.20
    The Fiat CR.20 was an Italian single-seat biplane fighter aircraft of the 1920s, widely used by the Regia Aeronautica and several foreign air forces.
  • E. Fiat G.18
    The Fiat G.18 was an Italian twin-engine airliner of the 1930s used primarily for commercial passenger transport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b518b8948190ad69cf9a8784d397 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e75aa52a508190bb5dc806b6483574 completed April 21, 2026, 11:08 a.m.
Created at: April 16, 2026, 4:05 p.m.