Triple
T21305905
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Atlas V 411 |
E525198
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Atlas V launch vehicle variant |
C2946
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Atlas V launch vehicle variant Context triple: [Atlas V 411, instanceOf, Atlas V launch vehicle variant]
-
A.
Saturn V mobile launcher
The Saturn V mobile launcher was a massive, self-contained launch platform and service structure that transported, supported, and provided umbilical connections to the Saturn V rocket from assembly to liftoff.
-
B.
orbital launch vehicle
An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
-
C.
expendable launch vehicle family
An expendable launch vehicle family is a series of related, single-use rockets designed to carry payloads into space and then be discarded after each mission.
-
D.
expendable launch vehicle
chosen
An expendable launch vehicle is a rocket designed for a single use to deliver payloads such as satellites or spacecraft into space, after which its components are discarded rather than recovered or reused.
-
E.
crew-rated launch vehicle
A crew-rated launch vehicle is a rocket system specifically designed, tested, and certified to safely transport humans to, in, and from space.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b518b8948190ad69cf9a8784d397 |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 4:05 p.m.