Triple

T21303059
Position Surface form Disambiguated ID Type / Status
Subject Singrauli district E525117 entity
Predicate hasPowerPlant P9904 FINISHED
Object Rihand Super Thermal Power Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rihand Super Thermal Power Project | Statement: [Singrauli district, hasPowerPlant, Rihand Super Thermal Power Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Rihand Super Thermal Power Project
Context triple: [Singrauli district, hasPowerPlant, Rihand Super Thermal Power Project]
  • A. Deenbandhu Chhotu Ram Thermal Power Station
    Deenbandhu Chhotu Ram Thermal Power Station is a coal-based power plant in Haryana, India, that generates electricity for the regional grid.
  • B. Guddu Thermal Power Station
    Guddu Thermal Power Station is a major thermal power plant in Pakistan that plays a key role in supplying electricity to the country’s national grid.
  • C. Vindhyachal Super Thermal Power Station
    Vindhyachal Super Thermal Power Station is one of India’s largest coal-fired power plants, operated by NTPC in Madhya Pradesh and serving as a major source of electricity for the region and the national grid.
  • D. Mettur Thermal Power Station
    Mettur Thermal Power Station is a major coal-fired power plant in Tamil Nadu, India, that supplies electricity to the regional grid.
  • E. Bandel Thermal Power Station
    Bandel Thermal Power Station is a coal-based thermal power plant located in Bandel, West Bengal, India, that supplies electricity to the regional grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Rihand Super Thermal Power Project
Target entity description: Rihand Super Thermal Power Project is a large coal-fired power station in India that plays a significant role in supplying electricity to the northern grid.
  • A. Deenbandhu Chhotu Ram Thermal Power Station
    Deenbandhu Chhotu Ram Thermal Power Station is a coal-based power plant in Haryana, India, that generates electricity for the regional grid.
  • B. Guddu Thermal Power Station
    Guddu Thermal Power Station is a major thermal power plant in Pakistan that plays a key role in supplying electricity to the country’s national grid.
  • C. Vindhyachal Super Thermal Power Station
    Vindhyachal Super Thermal Power Station is one of India’s largest coal-fired power plants, operated by NTPC in Madhya Pradesh and serving as a major source of electricity for the region and the national grid.
  • D. Mettur Thermal Power Station
    Mettur Thermal Power Station is a major coal-fired power plant in Tamil Nadu, India, that supplies electricity to the regional grid.
  • E. Bandel Thermal Power Station
    Bandel Thermal Power Station is a coal-based thermal power plant located in Bandel, West Bengal, India, that supplies electricity to the regional grid.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b517e6748190850d6f6ddf323d69 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7385da340819083c07f353f2142b0 completed April 21, 2026, 8:42 a.m.
Created at: April 16, 2026, 4:05 p.m.