Triple
T21299849
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Alfords Point Bridge |
E525029
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | twin bridge |
C21722
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: twin bridge Context triple: [Alfords Point Bridge, instanceOf, twin bridge]
-
A.
twin-span bridge
chosen
A twin-span bridge is a structure composed of two parallel bridge spans, typically used to carry traffic in opposite directions or to increase capacity across a single crossing.
-
B.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
C.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
D.
double-decked bridge
A double-decked bridge is a bridge structure with two vertically stacked levels of roadway, rail, or pedestrian paths designed to separate and manage different types or directions of traffic.
-
E.
pair of bridges
A pair of bridges is a conceptual structure representing two interconnected or complementary pathways that together enable traversal or connection between separate points or domains.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b517e6748190850d6f6ddf323d69 |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 4:05 p.m.