Triple

T21298279
Position Surface form Disambiguated ID Type / Status
Subject Raton, New Mexico E524986 entity
Predicate locatedOn P40 FINISHED
Object Interstate 25 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 25 | Statement: [Raton, New Mexico, locatedOn, Interstate 25]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 25
Context triple: [Raton, New Mexico, locatedOn, Interstate 25]
  • A. Interstate 25 chosen
    Interstate 25 is a major north–south U.S. highway running through the Rocky Mountain region, connecting cities from New Mexico through Colorado to Wyoming.
  • B. Interstate 70
    Interstate 70 is a major east–west U.S. highway that stretches from Utah to Maryland, serving as a key transportation corridor across the central United States.
  • C. Interstate 17
    Interstate 17 is a primary north–south freeway in Arizona that connects Phoenix with Flagstaff and serves as a key route to northern Arizona destinations.
  • D. Interstate 15
    Interstate 15 is a major north–south U.S. highway running from Southern California through the Intermountain West to the Canadian border, serving key cities such as Las Vegas and Salt Lake City.
  • E. Interstate 27
    Interstate 27 is a north–south U.S. Interstate Highway in Texas that connects the cities of Lubbock and Amarillo, serving as a key corridor through the Texas Panhandle and South Plains.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b517e6748190850d6f6ddf323d69 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7385a24d08190bfd410c7f10fa6f7 completed April 21, 2026, 8:42 a.m.
Created at: April 16, 2026, 4:04 p.m.