Triple

T21284318
Position Surface form Disambiguated ID Type / Status
Subject North Koel River E524612 entity
Predicate hasDamProject P143597 FINISHED
Object North Koel Project NE NERFINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North Koel Project | Statement: [North Koel River, hasDamProject, North Koel Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North Koel Project
Context triple: [North Koel River, hasDamProject, North Koel Project]
  • A. Mahanadi River Valley Project
    The Mahanadi River Valley Project is a major multipurpose river development scheme in India focused on flood control, irrigation, and hydroelectric power generation in the Mahanadi basin.
  • B. Malaprabha River Project
    The Malaprabha River Project is an irrigation and water management scheme in Karnataka, India, centered on harnessing the Malaprabha River through dams and reservoirs to support agriculture and regional development.
  • C. Damodar Valley Project
    The Damodar Valley Project is a major multipurpose river valley development scheme in eastern India focused on flood control, irrigation, power generation, and regional development in the Damodar River basin.
  • D. Chambal Valley Project
    The Chambal Valley Project is a major multipurpose river development scheme in India focused on irrigation, power generation, and flood control along the Chambal River.
  • E. Ujh Multipurpose Project
    The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: North Koel Project
Target entity description: The North Koel Project is a major irrigation and hydropower dam scheme on the North Koel River in eastern India, intended to provide water for agriculture and generate electricity in the region.
  • A. Mahanadi River Valley Project
    The Mahanadi River Valley Project is a major multipurpose river development scheme in India focused on flood control, irrigation, and hydroelectric power generation in the Mahanadi basin.
  • B. Malaprabha River Project
    The Malaprabha River Project is an irrigation and water management scheme in Karnataka, India, centered on harnessing the Malaprabha River through dams and reservoirs to support agriculture and regional development.
  • C. Damodar Valley Project
    The Damodar Valley Project is a major multipurpose river valley development scheme in eastern India focused on flood control, irrigation, power generation, and regional development in the Damodar River basin.
  • D. Chambal Valley Project
    The Chambal Valley Project is a major multipurpose river development scheme in India focused on irrigation, power generation, and flood control along the Chambal River.
  • E. Ujh Multipurpose Project
    The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasDamProject
Context triple: [North Koel River, hasDamProject, North Koel Project]
  • A. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • B. hasMajorDams
    Indicates that the subject possesses or contains one or more significant dams, typically large or important water-retaining structures.
  • C. typeOfDamProject
    Indicates that a given project is classified as a dam-related project (i.e., it is a project whose type is a dam project).
  • D. hasDam
    Indicates that a watercourse, reservoir, or similar feature is impounded or controlled by a specific dam.
  • E. isHydroelectricProjectOn
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5171f6c8190a5d57201ede73811 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e736d4e7f881909c2cc7936a66b79d completed April 21, 2026, 8:35 a.m.
PD Predicate disambiguation batch_69e61612ab748190a72b8703b938abcb completed April 20, 2026, 12:03 p.m.
PDg Predicate description generation batch_69e6190163448190a2404b396215c686 completed April 20, 2026, 12:16 p.m.
Created at: April 16, 2026, 4:03 p.m.