Triple
T21281866
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Convair X-6 |
E524546
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | nuclear-powered aircraft project |
C32709
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: nuclear-powered aircraft project Context triple: [Convair X-6, instanceOf, nuclear-powered aircraft project]
-
A.
nuclear-powered aircraft prototype
chosen
A nuclear-powered aircraft prototype is an experimental aircraft design that uses a nuclear reactor as its primary energy source to generate thrust or power propulsion systems, aiming for extremely long endurance without refueling.
-
B.
jet-powered hydroplane
A jet-powered hydroplane is a high-speed watercraft that uses jet propulsion and a specialized hull design to skim across the water’s surface with minimal drag.
-
C.
rocket-powered aircraft
A rocket-powered aircraft is a type of airplane that uses rocket engines for primary thrust, enabling very high speeds and altitudes over relatively short flight durations.
-
D.
jet-powered aircraft
A jet-powered aircraft is a fixed-wing or VTOL vehicle that generates thrust primarily from one or more jet engines to achieve and sustain flight.
-
E.
nuclear pulse propulsion system
A nuclear pulse propulsion system is a spacecraft propulsion method that generates thrust by detonating a series of small nuclear explosives behind the vehicle and transferring the resulting impulse through a robust pusher plate and shock-absorbing structure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b5171f6c8190a5d57201ede73811 |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 4:02 p.m.