Triple
T21280573
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Razdan River |
E524509
|
entity |
| Predicate | hasHydroelectricPlant |
P15311
|
FINISHED |
| Object | Arzni Hydroelectric Power Station |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Arzni Hydroelectric Power Station | Statement: [Razdan River, hasHydroelectricPlant, Arzni Hydroelectric Power Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Arzni Hydroelectric Power Station Context triple: [Razdan River, hasHydroelectricPlant, Arzni Hydroelectric Power Station]
-
A.
Fierza Hydroelectric Power Station
Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
-
B.
Warsak Hydropower Station
Warsak Hydropower Station is a major hydroelectric power plant in Pakistan that generates electricity from the Kabul River to supply the national grid.
-
C.
Krichim Hydroelectric Power Plant
Krichim Hydroelectric Power Plant is a Bulgarian hydroelectric facility that generates electricity using the waters of the Vacha River in the Rhodope Mountains.
-
D.
Zhinvali Hydroelectric Power Plant
The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
-
E.
Uch-Kurgan Hydroelectric Power Plant
Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Arzni Hydroelectric Power Station Target entity description: Arzni Hydroelectric Power Station is a hydroelectric power plant in Armenia that generates electricity using the flow of the Razdan River.
-
A.
Fierza Hydroelectric Power Station
Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
-
B.
Warsak Hydropower Station
Warsak Hydropower Station is a major hydroelectric power plant in Pakistan that generates electricity from the Kabul River to supply the national grid.
-
C.
Krichim Hydroelectric Power Plant
Krichim Hydroelectric Power Plant is a Bulgarian hydroelectric facility that generates electricity using the waters of the Vacha River in the Rhodope Mountains.
-
D.
Zhinvali Hydroelectric Power Plant
The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
-
E.
Uch-Kurgan Hydroelectric Power Plant
Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b516293c819089458ea2ec85f85e |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e736d186988190a5b16fcb669ece9f |
completed | April 21, 2026, 8:35 a.m. |
Created at: April 16, 2026, 4:02 p.m.