Triple

T21280573
Position Surface form Disambiguated ID Type / Status
Subject Razdan River E524509 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Arzni Hydroelectric Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Arzni Hydroelectric Power Station | Statement: [Razdan River, hasHydroelectricPlant, Arzni Hydroelectric Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Arzni Hydroelectric Power Station
Context triple: [Razdan River, hasHydroelectricPlant, Arzni Hydroelectric Power Station]
  • A. Fierza Hydroelectric Power Station
    Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
  • B. Warsak Hydropower Station
    Warsak Hydropower Station is a major hydroelectric power plant in Pakistan that generates electricity from the Kabul River to supply the national grid.
  • C. Krichim Hydroelectric Power Plant
    Krichim Hydroelectric Power Plant is a Bulgarian hydroelectric facility that generates electricity using the waters of the Vacha River in the Rhodope Mountains.
  • D. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • E. Uch-Kurgan Hydroelectric Power Plant
    Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Arzni Hydroelectric Power Station
Target entity description: Arzni Hydroelectric Power Station is a hydroelectric power plant in Armenia that generates electricity using the flow of the Razdan River.
  • A. Fierza Hydroelectric Power Station
    Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
  • B. Warsak Hydropower Station
    Warsak Hydropower Station is a major hydroelectric power plant in Pakistan that generates electricity from the Kabul River to supply the national grid.
  • C. Krichim Hydroelectric Power Plant
    Krichim Hydroelectric Power Plant is a Bulgarian hydroelectric facility that generates electricity using the waters of the Vacha River in the Rhodope Mountains.
  • D. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • E. Uch-Kurgan Hydroelectric Power Plant
    Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b516293c819089458ea2ec85f85e completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e736d186988190a5b16fcb669ece9f completed April 21, 2026, 8:35 a.m.
Created at: April 16, 2026, 4:02 p.m.