Triple

T21280572
Position Surface form Disambiguated ID Type / Status
Subject Razdan River E524509 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Argel Hydroelectric Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Argel Hydroelectric Power Station | Statement: [Razdan River, hasHydroelectricPlant, Argel Hydroelectric Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Argel Hydroelectric Power Station
Context triple: [Razdan River, hasHydroelectricPlant, Argel Hydroelectric Power Station]
  • A. Al Massira hydroelectric plant
    Al Massira hydroelectric plant is a major Moroccan power station that generates electricity from the Al Massira Dam on the Oum Er-Rbia River.
  • B. Bin el Ouidane hydroelectric plant
    The Bin el Ouidane hydroelectric plant is a major Moroccan power station that harnesses the waters of the Oum Er-Rbia River to generate electricity and support regional water management.
  • C. Shamaldy-Sai Hydroelectric Power Plant
    The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
  • D. Krichim Hydroelectric Power Plant
    Krichim Hydroelectric Power Plant is a Bulgarian hydroelectric facility that generates electricity using the waters of the Vacha River in the Rhodope Mountains.
  • E. Haditha Hydroelectric Power Station
    Haditha Hydroelectric Power Station is a major hydroelectric facility in Iraq that generates electricity using water from the Haditha Dam on the Euphrates River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Argel Hydroelectric Power Station
Target entity description: Argel Hydroelectric Power Station is a hydroelectric power facility located on the Razdan River in Armenia, generating electricity by harnessing the river’s flow.
  • A. Al Massira hydroelectric plant
    Al Massira hydroelectric plant is a major Moroccan power station that generates electricity from the Al Massira Dam on the Oum Er-Rbia River.
  • B. Bin el Ouidane hydroelectric plant
    The Bin el Ouidane hydroelectric plant is a major Moroccan power station that harnesses the waters of the Oum Er-Rbia River to generate electricity and support regional water management.
  • C. Shamaldy-Sai Hydroelectric Power Plant
    The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
  • D. Krichim Hydroelectric Power Plant
    Krichim Hydroelectric Power Plant is a Bulgarian hydroelectric facility that generates electricity using the waters of the Vacha River in the Rhodope Mountains.
  • E. Haditha Hydroelectric Power Station
    Haditha Hydroelectric Power Station is a major hydroelectric facility in Iraq that generates electricity using water from the Haditha Dam on the Euphrates River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b516293c819089458ea2ec85f85e completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e736d186988190a5b16fcb669ece9f completed April 21, 2026, 8:35 a.m.
Created at: April 16, 2026, 4:02 p.m.