Triple

T21275218
Position Surface form Disambiguated ID Type / Status
Subject Pier 62 E524370 entity
Predicate instanceOf P0 FINISHED
Object public waterfront pier C5954 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public waterfront pier
Context triple: [Pier 62, instanceOf, public waterfront pier]
  • A. waterfront pier complex chosen
    A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
  • B. river pier
    A river pier is a fixed or floating structure extending from the riverbank into the water, used for mooring boats, loading and unloading goods or passengers, and providing access to the river.
  • C. fishing pier
    A fishing pier is a raised structure extending from the shore over the water, designed to provide anglers with safe, convenient access to deeper fishing areas without using a boat.
  • D. waterfront hub
    A waterfront hub is a central, mixed-use area located along a body of water that concentrates transportation, commerce, recreation, and social activities to connect people with the waterfront.
  • E. oceanographic research pier
    An oceanographic research pier is a specialized coastal structure extending into the sea, equipped with instruments and facilities that allow scientists to conduct long-term, in situ studies of marine and atmospheric processes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b516293c819089458ea2ec85f85e completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 4:01 p.m.