Triple

T21271044
Position Surface form Disambiguated ID Type / Status
Subject Lezíria do Tejo E524254 entity
Predicate traversedBy P225 FINISHED
Object Sorraia River NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sorraia River | Statement: [Lezíria do Tejo, traversedBy, Sorraia River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sorraia River
Context triple: [Lezíria do Tejo, traversedBy, Sorraia River]
  • A. Sorraia River chosen
    The Sorraia River is a significant river in central Portugal that flows through agricultural plains before joining the Tagus River system.
  • B. Darro River
    The Darro River is a small Andalusian river that flows through the historic center of Granada, Spain, running alongside the Alhambra and contributing to the city's distinctive landscape.
  • C. Pediaios River
    Pediaios River is a river in Cyprus that flows through the capital city of Nicosia before reaching the eastern coast.
  • D. Anoia River
    The Anoia River is a river in Catalonia, Spain, that flows through several towns and agricultural areas before joining the Llobregat River.
  • E. Sebes River
    The Sebes River is a significant watercourse in central Romania that flows through the Apuseni Mountains and Transylvanian Plateau before joining the Mureș River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b516293c819089458ea2ec85f85e completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e736534c348190a8d29e8d724dd40a completed April 21, 2026, 8:33 a.m.
Created at: April 16, 2026, 4:01 p.m.