Triple

T21269875
Position Surface form Disambiguated ID Type / Status
Subject TIA-569 E524225 entity
Predicate relatedTo P37 FINISHED
Object TIA-607 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TIA-607 | Statement: [TIA-569, relatedTo, TIA-607]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: TIA-607
Context triple: [TIA-569, relatedTo, TIA-607]
  • A. TIA-607 chosen
    TIA-607 is a Telecommunications Industry Association standard that defines requirements for telecommunications grounding and bonding in commercial buildings and data centers.
  • B. TIA-606
    TIA-606 is a Telecommunications Industry Association standard that defines guidelines for the administration and labeling of telecommunications infrastructure in commercial buildings.
  • C. TIA-942
    TIA-942 is a widely recognized data center infrastructure standard that defines requirements and best practices for the design, cabling, and operation of reliable and scalable data centers.
  • D. TIA-569
    TIA-569 is a Telecommunications Industry Association standard that specifies pathways and spaces design requirements for commercial building telecommunications infrastructure.
  • E. TIA-758
    TIA-758 is a Telecommunications Industry Association standard that defines technical and performance requirements for outside plant telecommunications cabling systems.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b516293c819089458ea2ec85f85e completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e73651c9208190a87d45acd6fafaaa completed April 21, 2026, 8:33 a.m.
Created at: April 16, 2026, 4:01 p.m.