Triple
T21262182
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wandsworth Bridge |
E524031
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | River Thames bridge |
C18495
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: River Thames bridge Context triple: [Wandsworth Bridge, instanceOf, River Thames bridge]
-
A.
bridge in London
chosen
A bridge in London is a structural crossing over the River Thames or other waterways in the city, designed to support vehicular, rail, or pedestrian traffic while integrating with the historic and urban landscape.
-
B.
Seine bridge
A Seine bridge is a structure that spans the River Seine, providing a crossing for pedestrians, vehicles, or trains while often serving as an architectural and cultural landmark within its urban setting.
-
C.
bridge over the River Trent
A bridge over the River Trent is a structural crossing that spans the river to connect its banks, enabling the movement of people, vehicles, or goods across the waterway.
-
D.
iron bridge
An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
-
E.
bridge in Bristol
A bridge in Bristol is a structural crossing—such as the iconic Clifton Suspension Bridge—spanning a river, road, or gorge within or near the city to connect different areas and support transport and movement.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b5156d7881909bd4f83676590715 |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 4 p.m.