Triple

T21256048
Position Surface form Disambiguated ID Type / Status
Subject Leipzig–Probstzella railway E523871 entity
Predicate instanceOf P0 FINISHED
Object rail transport infrastructure C3584 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5146c108190adc9adb73e90abff completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 3:58 p.m.