Triple

T21252534
Position Surface form Disambiguated ID Type / Status
Subject Rio Algom E523779 entity
Predicate hasEnvironmentalLiabilities P143388 FINISHED
Object uranium tailings management in Elliot Lake LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: uranium tailings management in Elliot Lake | Statement: [Rio Algom, hasEnvironmentalLiabilities, uranium tailings management in Elliot Lake]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasEnvironmentalLiabilities
Context triple: [Rio Algom, hasEnvironmentalLiabilities, uranium tailings management in Elliot Lake]
  • A. hasEnvironmentalRisk
    Indicates that an entity poses, contributes to, or is associated with potential harm or adverse impact on the environment.
  • B. hasEnvironmentalImpactType
    Indicates that something affects the environment in a specific way categorized by a particular type of impact.
  • C. hasEnvironmentalImpactOn
    Indicates that one entity affects or alters the environmental conditions, quality, or ecological state of another entity.
  • D. hasEnvironmentalMitigation
    Indicates that an entity has associated measures, actions, or features intended to reduce, offset, or manage its negative environmental impacts.
  • E. hasEnvironmentalManagementPlan
    Indicates that an entity has established and maintains a formal plan for managing, monitoring, and mitigating its environmental impacts.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5146c108190adc9adb73e90abff completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7359f5b408190b951adddba83c97a completed April 21, 2026, 8:30 a.m.
PD Predicate disambiguation batch_69e5f61239708190ab7b3c83ae848a0d completed April 20, 2026, 9:46 a.m.
PDg Predicate description generation batch_69e5f9943ed881909ef49045c5bcf6df completed April 20, 2026, 10:01 a.m.
Created at: April 16, 2026, 3:57 p.m.