Triple

T21249660
Position Surface form Disambiguated ID Type / Status
Subject Gamarra station E523707 entity
Predicate hasLine P35 FINISHED
Object Line 1 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 1 | Statement: [Gamarra station, hasLine, Line 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Line 1
Context triple: [Gamarra station, hasLine, Line 1]
  • A. Line 1
    Line 1 is a major rapid transit line of the Guangzhou Metro system in Guangzhou, China, serving as one of the city's primary east–west corridors.
  • B. Line 1
    Line 1 is the oldest and one of the busiest lines of the Paris Métro, running primarily east–west through central Paris and serving many major landmarks.
  • C. Line 1
    Line 1 is the numerical designation commonly used for Ottawa’s Confederation Line, the city’s primary light rail transit route.
  • D. Line 1
    Line 1 is the first rapid transit line of the Santo Domingo Metro system, serving as a major north–south corridor through the Dominican Republic’s capital.
  • E. Line 1
    Line 1 is the inaugural corridor of the Mexico City Metrobús bus rapid transit system, serving as a major north–south transit route in the city.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Line 1
Target entity description: Line 1 is the primary north–south line of the Lima Metro in Peru, connecting key districts across the city.
  • A. Line 1
    Line 1 is the first and main rapid transit line of the Seville Metro system in Seville, Spain, connecting key districts across the metropolitan area.
  • B. Line 1
    Line 1 is the first and primary rapid transit line of the Sofia Metro system in Bulgaria, connecting key residential districts with the city center and major transport hubs.
  • C. Line 1
    Line 1 is the first and one of the main rapid transit lines of the Nanjing Metro system in Nanjing, China, connecting key urban areas along a north–south corridor.
  • D. Line 1
    Line 1 is the oldest and one of the busiest lines of the Santiago Metro, running primarily east–west across central Santiago, Chile.
  • E. Line 1
    Line 1 is a principal light rail route of the Tunis Metro system, serving key districts within the Tunis metropolitan area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5146c108190adc9adb73e90abff completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7359c7a648190b4345336ac3be024 completed April 21, 2026, 8:30 a.m.
Created at: April 16, 2026, 3:56 p.m.