Triple

T21249194
Position Surface form Disambiguated ID Type / Status
Subject Padalarang E523695 entity
Predicate traversedBy P225 FINISHED
Object Cipularang Toll Road NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cipularang Toll Road | Statement: [Padalarang, traversedBy, Cipularang Toll Road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cipularang Toll Road
Context triple: [Padalarang, traversedBy, Cipularang Toll Road]
  • A. Soreang–Pasir Koja Toll Road
    The Soreang–Pasir Koja Toll Road is a toll expressway in West Java, Indonesia, that connects the town of Soreang with the city of Bandung, improving regional accessibility and travel times.
  • B. Trans-Java Toll Road
    The Trans-Java Toll Road is a major expressway network spanning the length of Java Island in Indonesia, designed to enhance connectivity, reduce travel time, and support economic growth across the island’s key cities and industrial regions.
  • C. Jakarta Outer Ring Road
    Jakarta Outer Ring Road is a major toll expressway encircling Jakarta, Indonesia, designed to alleviate inner-city traffic congestion and connect key urban and suburban areas.
  • D. Trans-Sumatra Toll Road
    The Trans-Sumatra Toll Road is a major expressway network designed to connect key cities across Sumatra, boosting regional connectivity and economic development in Indonesia.
  • E. Pasir Gudang Highway
    Pasir Gudang Highway is a major roadway in Johor, Malaysia, that serves as a key route connecting the industrial town of Pasir Gudang with other parts of the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Cipularang Toll Road
Target entity description: Cipularang Toll Road is a major expressway in West Java, Indonesia, connecting Jakarta and Bandung and significantly reducing travel time between the two cities.
  • A. Soreang–Pasir Koja Toll Road
    The Soreang–Pasir Koja Toll Road is a toll expressway in West Java, Indonesia, that connects the town of Soreang with the city of Bandung, improving regional accessibility and travel times.
  • B. Trans-Java Toll Road
    The Trans-Java Toll Road is a major expressway network spanning the length of Java Island in Indonesia, designed to enhance connectivity, reduce travel time, and support economic growth across the island’s key cities and industrial regions.
  • C. Jakarta Outer Ring Road
    Jakarta Outer Ring Road is a major toll expressway encircling Jakarta, Indonesia, designed to alleviate inner-city traffic congestion and connect key urban and suburban areas.
  • D. Trans-Sumatra Toll Road
    The Trans-Sumatra Toll Road is a major expressway network designed to connect key cities across Sumatra, boosting regional connectivity and economic development in Indonesia.
  • E. Pasir Gudang Highway
    Pasir Gudang Highway is a major roadway in Johor, Malaysia, that serves as a key route connecting the industrial town of Pasir Gudang with other parts of the region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5146c108190adc9adb73e90abff completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7359c7a648190b4345336ac3be024 completed April 21, 2026, 8:30 a.m.
Created at: April 16, 2026, 3:56 p.m.