Triple
T21230962
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Napa River Flood Protection Project |
E523213
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | civil works project |
C26451
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: civil works project Context triple: [Napa River Flood Protection Project, instanceOf, civil works project]
-
A.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
proposed dam project
A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
-
C.
corps of engineers
A corps of engineers is an organized body of military or civilian engineers responsible for planning, designing, constructing, and maintaining infrastructure and technical projects, often in support of national defense or public works.
-
D.
water management project
A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
-
E.
public works project
chosen
A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b512ad94819087942b2ed925185f |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 3:45 p.m.