Triple

T21227333
Position Surface form Disambiguated ID Type / Status
Subject Gateway Mobile Switching Centre E523116 entity
Predicate instanceOf P0 FINISHED
Object mobile switching centre C44400 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mobile switching centre
Context triple: [Gateway Mobile Switching Centre, instanceOf, mobile switching centre]
  • A. mobile satellite service system
    A mobile satellite service system is a communication network that uses satellites to provide voice, data, and messaging connectivity to mobile users over wide geographic areas, including remote and underserved regions.
  • B. mobility management protocol
    A mobility management protocol is a set of rules and procedures that enables devices to maintain seamless network connectivity and consistent addressing while moving across different networks or access points.
  • C. switching and terminal company
    A switching and terminal company is a railroad entity that specializes in transferring railcars between different rail lines and managing terminal operations within a specific geographic area or rail hub.
  • D. mobile portal operator
    A mobile portal operator is an entity that manages and delivers curated content, services, and applications to users through a centralized interface on mobile devices, often integrating billing, access control, and partnerships with content providers.
  • E. mobile phone line
    A mobile phone line is a telecommunications service subscription that assigns a unique phone number and network access to a mobile device for voice, text, and data communication.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b512ad94819087942b2ed925185f completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 3:44 p.m.