Triple

T21226080
Position Surface form Disambiguated ID Type / Status
Subject Sy E523086 entity
Predicate endpointRole P110756 FINISHED
Object Online Charging System NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Online Charging System | Statement: [Sy, endpointRole, Online Charging System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Online Charging System
Context triple: [Sy, endpointRole, Online Charging System]
  • A. Online Charging System chosen
    An Online Charging System is a real-time telecommunications platform that rates, charges, and manages subscribers’ usage of services such as voice, data, and messaging.
  • B. Offline Charging System
    The Offline Charging System is a telecom network component that collects usage data and generates billing records for services that are charged after consumption rather than in real time.
  • C. BP Chargemaster
    BP Chargemaster was a UK-based electric vehicle charging network and service provider that operated public and workplace charge points before being rebranded as bp pulse.
  • D. Charge On
    "Charge On" is the spirited fight song of the University of Central Florida Knights, played to rally fans and athletes at UCF sporting events.
  • E. CCS (Combined Charging System)
    CCS (Combined Charging System) is a widely adopted fast-charging standard for electric vehicles that combines AC and DC charging capabilities in a single connector design.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b512ad94819087942b2ed925185f completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e734ab3f6c819083e277ea1c33134e completed April 21, 2026, 8:26 a.m.
Created at: April 16, 2026, 3:44 p.m.