Triple

T21225920
Position Surface form Disambiguated ID Type / Status
Subject Offline Charging System E523083 entity
Predicate instanceOf P0 FINISHED
Object charging system C44392 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: charging system
Context triple: [Offline Charging System, instanceOf, charging system]
  • A. electric vehicle charging network
    An electric vehicle charging network is a coordinated system of charging stations, infrastructure, and management services that supplies power to electric vehicles across multiple locations.
  • B. AC charging connector
    An AC charging connector is a physical interface that enables the transfer of alternating current electrical power from a supply source to an electric vehicle or device for charging its battery.
  • C. high-power DC fast charging system
    A high-power DC fast charging system is an electrical infrastructure that delivers large amounts of direct current at high voltage and current levels to rapidly recharge electric vehicle batteries, typically reducing charging times to minutes instead of hours.
  • D. battery
    A battery is an energy storage device that converts chemical energy into electrical energy to provide power to electronic systems and components.
  • E. fast charging network
    A fast charging network is an interconnected system of high-power electric vehicle charging stations designed to rapidly recharge EV batteries across wide geographic areas.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b512ad94819087942b2ed925185f completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 3:44 p.m.