Triple
T21214369
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Texas Interconnection |
E522797
|
entity |
| Predicate | reliabilityStandardBody |
P1251
|
FINISHED |
| Object | North American Electric Reliability Corporation |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North American Electric Reliability Corporation | Statement: [Texas Interconnection, reliabilityStandardBody, North American Electric Reliability Corporation]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: North American Electric Reliability Corporation Context triple: [Texas Interconnection, reliabilityStandardBody, North American Electric Reliability Corporation]
-
A.
North American Electric Reliability Corporation
chosen
The North American Electric Reliability Corporation (NERC) is a nonprofit regulatory authority responsible for developing and enforcing reliability standards for the bulk power system across North America.
-
B.
Northeast Power Coordinating Council
The Northeast Power Coordinating Council is a regional reliability organization that oversees and promotes the reliable and secure operation of the bulk power system in the northeastern part of North America.
-
C.
Western Electricity Coordinating Council
The Western Electricity Coordinating Council is a regional reliability organization that oversees and coordinates the safe, reliable operation of the bulk electric power system across the Western Interconnection in North America.
-
D.
National Electric Power Regulatory Authority
The National Electric Power Regulatory Authority (NEPRA) is Pakistan’s federal agency responsible for regulating and overseeing the country’s electric power sector, including licensing, tariffs, and consumer protection.
-
E.
SERC Reliability Corporation
SERC Reliability Corporation is a regional organization responsible for overseeing and enforcing bulk power system reliability standards across parts of the southeastern and central United States under the North American Electric Reliability Corporation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: reliabilityStandardBody Context triple: [Texas Interconnection, reliabilityStandardBody, North American Electric Reliability Corporation]
-
A.
hasReliabilityStandards
Indicates that one entity defines, follows, or is governed by specific reliability standards established by another entity.
-
B.
isStandardOf
Indicates that something serves as the recognized norm, reference, or benchmark by which another thing is defined, measured, or evaluated.
-
C.
hasStandardizationBody
chosen
Indicates that an entity is associated with, governed by, or defined by a specific standards-setting organization or authority.
-
D.
isPartOfStandard
Indicates that something belongs to, is included within, or conforms to a defined standard or standardized set.
-
E.
standardsUsedIn
Indicates that certain standards are applied, referenced, or followed within a particular context, process, or entity.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b511ed84819099b449b4a111085c |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e734727a30819089c433e4fe6f438a |
completed | April 21, 2026, 8:25 a.m. |
| PD | Predicate disambiguation | batch_69e5f6094e3c81909ee9699e00d371f7 |
completed | April 20, 2026, 9:46 a.m. |
Created at: April 16, 2026, 3:39 p.m.