Triple
T21214345
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Texas Interconnection |
E522797
|
entity |
| Predicate | regulatoryJurisdiction |
P808
|
FINISHED |
| Object | Public Utility Commission of Texas |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Public Utility Commission of Texas | Statement: [Texas Interconnection, regulatoryJurisdiction, Public Utility Commission of Texas]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Public Utility Commission of Texas Context triple: [Texas Interconnection, regulatoryJurisdiction, Public Utility Commission of Texas]
-
A.
Electric Reliability Council of Texas
The Electric Reliability Council of Texas (ERCOT) is the independent system operator that manages the flow of electric power and oversees grid reliability for most of the state of Texas.
-
B.
Texas Reliability Entity
Texas Reliability Entity is a regional organization responsible for overseeing and enforcing electric grid reliability standards within its jurisdiction in Texas under the North American Electric Reliability Corporation framework.
-
C.
Texas Commission on Environmental Quality
The Texas Commission on Environmental Quality is the state agency responsible for protecting Texas’s public health and natural resources by regulating air, water, and waste management.
-
D.
Texas Facilities Commission
The Texas Facilities Commission is a state agency responsible for managing, maintaining, and providing support services for Texas government buildings and properties.
-
E.
Texas Transportation Commission
The Texas Transportation Commission is the governing body that oversees the planning, funding, and policy direction of the statewide transportation system in Texas.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Public Utility Commission of Texas Target entity description: The Public Utility Commission of Texas is the state agency that regulates Texas’s electric, telecommunication, and water and sewer utilities, overseeing market operations and consumer protection.
-
A.
Electric Reliability Council of Texas
The Electric Reliability Council of Texas (ERCOT) is the independent system operator that manages the flow of electric power and oversees grid reliability for most of the state of Texas.
-
B.
Texas Reliability Entity
Texas Reliability Entity is a regional organization responsible for overseeing and enforcing electric grid reliability standards within its jurisdiction in Texas under the North American Electric Reliability Corporation framework.
-
C.
Texas Commission on Environmental Quality
The Texas Commission on Environmental Quality is the state agency responsible for protecting Texas’s public health and natural resources by regulating air, water, and waste management.
-
D.
Texas Facilities Commission
The Texas Facilities Commission is a state agency responsible for managing, maintaining, and providing support services for Texas government buildings and properties.
-
E.
Texas Transportation Commission
The Texas Transportation Commission is the governing body that oversees the planning, funding, and policy direction of the statewide transportation system in Texas.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b511ed84819099b449b4a111085c |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e734727a30819089c433e4fe6f438a |
completed | April 21, 2026, 8:25 a.m. |
Created at: April 16, 2026, 3:39 p.m.