Triple

T21214297
Position Surface form Disambiguated ID Type / Status
Subject North American power transmission grid E522796 entity
Predicate synchronizedArea P143583 FINISHED
Object Eastern Interconnection NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eastern Interconnection | Statement: [North American power transmission grid, synchronizedArea, Eastern Interconnection]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eastern Interconnection
Context triple: [North American power transmission grid, synchronizedArea, Eastern Interconnection]
  • A. Eastern Interconnection chosen
    The Eastern Interconnection is one of North America's major synchronized AC power grids, spanning much of the eastern and central United States and parts of Canada.
  • B. Western Interconnection
    The Western Interconnection is a major synchronized electric power grid that spans much of western North America, linking utilities and power plants across multiple U.S. states, Canadian provinces, and parts of Mexico.
  • C. Eastern Regional Grid
    The Eastern Regional Grid is a major power transmission network in eastern India that forms one of the key regional components of the country’s integrated national electricity grid.
  • D. Midcontinent Independent System Operator region
    The Midcontinent Independent System Operator region is a large North American electric transmission and wholesale power market area coordinated by MISO, spanning multiple U.S. states and parts of Canada to ensure reliable, efficient grid operations.
  • E. Northern Regional Grid
    The Northern Regional Grid is a major power transmission network in India that coordinates electricity generation and distribution across the northern states as part of the national grid system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: synchronizedArea
Context triple: [North American power transmission grid, synchronizedArea, Eastern Interconnection]
  • A. synchronizationBoundary
    Indicates a point or condition at which concurrent or distributed processes must align or coordinate their states or actions to maintain consistency.
  • B. regionLocking
    Indicates that access to or use of something is restricted based on the geographic region of the user or device.
  • C. protectsArea
    Indicates that one entity serves to guard, defend, or preserve a particular area or region from harm or intrusion.
  • D. lockedMeans
    Indicates that one state, condition, or action guarantees or necessitates another, such that when the first is "locked in," the second must follow.
  • E. guardedRegion
    Indicates that a region is protected or watched over by some guarding entity or mechanism.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b511ed84819099b449b4a111085c completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e734727a30819089c433e4fe6f438a completed April 21, 2026, 8:25 a.m.
PD Predicate disambiguation batch_69e5f6094e3c81909ee9699e00d371f7 completed April 20, 2026, 9:46 a.m.
PDg Predicate description generation batch_69e5fa92a2448190896c022dd27511ad completed April 20, 2026, 10:06 a.m.
Created at: April 16, 2026, 3:39 p.m.