Triple
T21214283
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Eastern Interconnection |
E522795
|
entity |
| Predicate | reliabilityRegion |
P38421
|
FINISHED |
| Object | NERC Eastern Interconnection |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NERC Eastern Interconnection | Statement: [Eastern Interconnection, reliabilityRegion, NERC Eastern Interconnection]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: NERC Eastern Interconnection Context triple: [Eastern Interconnection, reliabilityRegion, NERC Eastern Interconnection]
-
A.
Eastern Interconnection
chosen
The Eastern Interconnection is one of North America's major synchronized AC power grids, spanning much of the eastern and central United States and parts of Canada.
-
B.
Northeast Power Coordinating Council
The Northeast Power Coordinating Council is a regional reliability organization that oversees and promotes the reliable and secure operation of the bulk power system in the northeastern part of North America.
-
C.
Midcontinent Independent System Operator region
The Midcontinent Independent System Operator region is a large North American electric transmission and wholesale power market area coordinated by MISO, spanning multiple U.S. states and parts of Canada to ensure reliable, efficient grid operations.
-
D.
Northern Regional Grid
The Northern Regional Grid is a major power transmission network in India that coordinates electricity generation and distribution across the northern states as part of the national grid system.
-
E.
North Eastern Regional Grid
The North Eastern Regional Grid is a major power transmission network that supplies and coordinates electricity across India’s northeastern states as part of the national grid system.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: reliabilityRegion Context triple: [Eastern Interconnection, reliabilityRegion, NERC Eastern Interconnection]
-
A.
sensitivityRegion
Indicates the specific area or domain within which a subject is particularly responsive, vulnerable, or reactive to a given influence or condition.
-
B.
isRegionOf
chosen
Indicates that one entity is a geographic or administrative region belonging to, contained within, or associated with another entity.
-
C.
validityArea
Indicates the geographic or contextual area within which something (such as a rule, document, or status) is considered valid or in effect.
-
D.
likelyRegion
Indicates that an entity is probably located in, associated with, or originates from a particular geographic region.
-
E.
regionOfRecognition
Indicates the geographic or administrative area within which something is officially acknowledged, valid, or recognized.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b511ed84819099b449b4a111085c |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e734727a30819089c433e4fe6f438a |
completed | April 21, 2026, 8:25 a.m. |
| PD | Predicate disambiguation | batch_69e5f6094e3c81909ee9699e00d371f7 |
completed | April 20, 2026, 9:46 a.m. |
Created at: April 16, 2026, 3:39 p.m.