Triple

T21200563
Position Surface form Disambiguated ID Type / Status
Subject Expedition 15 E522442 entity
Predicate launchVehicle P4020 FINISHED
Object Space Shuttle STS-118 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Space Shuttle STS-118 | Statement: [Expedition 15, launchVehicle, Space Shuttle STS-118]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Space Shuttle STS-118
Context triple: [Expedition 15, launchVehicle, Space Shuttle STS-118]
  • A. STS-118 chosen
    STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
  • B. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • C. STS-119
    STS-119 was a NASA Space Shuttle Discovery mission to the International Space Station in 2009 that delivered the final set of U.S. solar arrays and included astronaut Sandra Magnus as a crew member.
  • D. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • E. STS-113
    STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5112d8881909510b2dcdc93106d completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e73430c5a08190aeb6a62eec0f43a3 completed April 21, 2026, 8:24 a.m.
Created at: April 16, 2026, 3:18 p.m.