Triple
T21200134
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jefferson Lab 12 GeV Upgrade program |
E522432
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | scientific infrastructure project |
C44349
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: scientific infrastructure project Context triple: [Jefferson Lab 12 GeV Upgrade program, instanceOf, scientific infrastructure project]
-
A.
scientific instrumentation project
A scientific instrumentation project is an organized effort to design, develop, and validate specialized tools or devices that enable precise measurement, observation, or experimentation in scientific research.
-
B.
research infrastructure component
A research infrastructure component is a foundational hardware, software, or service element that supports the collection, storage, processing, and sharing of data and tools necessary for conducting and advancing research.
-
C.
space infrastructure project
A space infrastructure project is a large-scale, coordinated initiative to design, build, and operate physical and digital systems that enable sustained activities and services in space, such as communication, transportation, energy, and research.
-
D.
scientific drilling project
A scientific drilling project is a coordinated research effort that uses specialized drilling techniques to recover subsurface samples and data in order to investigate geological, environmental, or planetary processes.
-
E.
National Science Foundation facility
A National Science Foundation facility is a research infrastructure, laboratory, observatory, or center funded or supported by the NSF to enable and advance scientific discovery and education across diverse disciplines.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b5112d8881909510b2dcdc93106d |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 3:18 p.m.