Triple

T21195991
Position Surface form Disambiguated ID Type / Status
Subject Löhne–Rheine railway E522326 entity
Predicate endPoint P390 FINISHED
Object Rheine NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rheine | Statement: [Löhne–Rheine railway, endPoint, Rheine]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Rheine
Context triple: [Löhne–Rheine railway, endPoint, Rheine]
  • A. Rheine chosen
    Rheine is a German city in the state of North Rhine-Westphalia, known for its historical town center and location along the River Ems.
  • B. Rhein II
    Rhein II is a large-scale color photograph by German visual artist Andreas Gursky, renowned for its minimalist depiction of the Rhine River and for once being the most expensive photograph ever sold at auction.
  • C. Blies
    The Blies is a river in western Germany and northeastern France that flows through the Saarland region before joining the Saar River.
  • D. River Wiese
    The River Wiese is a river in southwestern Germany and northwestern Switzerland that flows through the Black Forest region before joining the Rhine near Basel.
  • E. Roer
    The Roer is a river in Western Europe that flows through parts of Belgium, Germany, and the Netherlands before joining the Meuse.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b51061388190aa03f19700d3ef04 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7333bd7a0819084bbd1d6c111bc65 completed April 21, 2026, 8:20 a.m.
Created at: April 16, 2026, 3:08 p.m.