Triple
T21192916
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PDCP |
E522254
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | E-UTRAN protocol layer |
C44328
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: E-UTRAN protocol layer Context triple: [PDCP, instanceOf, E-UTRAN protocol layer]
-
A.
LTE-Advanced enhancement release
LTE-Advanced enhancement release is a standardized set of incremental upgrades to the LTE-Advanced mobile communication system that introduce new features and performance improvements beyond the original LTE-Advanced specifications.
-
B.
IEEE 802.21 feature set
The IEEE 802.21 feature set comprises mechanisms and protocols that enable seamless media-independent handover and service continuity across heterogeneous wireless and wired networks.
-
C.
GPRS packet control unit implementation
A GPRS packet control unit implementation is the software and hardware logic that manages radio resource allocation, packet scheduling, and data flow control between mobile stations and the core network in a GPRS system.
-
D.
3GPP standardized parameter
A 3GPP standardized parameter is a formally defined technical value or setting specified by the 3rd Generation Partnership Project to ensure interoperability, performance, and compliance across mobile communication systems and equipment.
-
E.
Ethernet fronthaul standard
An Ethernet fronthaul standard defines the protocols, interfaces, and performance requirements for transporting radio access network (RAN) traffic between distributed radio units and centralized baseband units over Ethernet-based networks.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b51061388190aa03f19700d3ef04 |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 3:07 p.m.