Triple
T21184919
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Far North Construction Trust |
E522055
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Gulag system component |
C29336
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Gulag system component Context triple: [Far North Construction Trust, instanceOf, Gulag system component]
-
A.
Gulag administrative body
The Gulag administrative body is the centralized state organization responsible for planning, managing, and overseeing the operation of forced labor camps within the Soviet penal system.
-
B.
forced-labor camp network
chosen
A forced-labor camp network is a system of interconnected detention sites where individuals are coerced into work under threat, violence, or deprivation, typically organized and maintained by state or paramilitary authorities for economic, political, or ideological purposes.
-
C.
forced labor camp
A forced labor camp is a detention facility where individuals are confined and compelled to work under coercion, often in harsh and abusive conditions, without the freedom to leave or refuse.
-
D.
German prisoner-of-war camp system
The German prisoner-of-war camp system was a network of military-run facilities in Nazi Germany and occupied territories designed to detain, control, and exploit captured enemy combatants under varying conditions that often violated international law.
-
E.
former incarceration camp
A former incarceration camp is a site previously used to detain individuals under restrictive or punitive conditions, which has since been closed, repurposed, or preserved as a historical or memorial location.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b50ef1d48190b063aa342667df22 |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 3:06 p.m.