Triple
T21184918
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Far North Construction Trust |
E522055
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | forced labor administration |
C10586
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: forced labor administration Context triple: [Far North Construction Trust, instanceOf, forced labor administration]
-
A.
forced labor camp
A forced labor camp is a detention facility where individuals are confined and compelled to work under coercion, often in harsh and abusive conditions, without the freedom to leave or refuse.
-
B.
forced-labor camp network
A forced-labor camp network is a system of interconnected detention sites where individuals are coerced into work under threat, violence, or deprivation, typically organized and maintained by state or paramilitary authorities for economic, political, or ideological purposes.
-
C.
Gulag administrative body
chosen
The Gulag administrative body is the centralized state organization responsible for planning, managing, and overseeing the operation of forced labor camps within the Soviet penal system.
-
D.
indentured labor system
The indentured labor system was a form of unfree labor in which individuals contracted to work for a fixed period, often under harsh and exploitative conditions, in exchange for passage, subsistence, or the promise of future compensation.
-
E.
labor department
The labor department is a governmental or organizational unit responsible for overseeing employment standards, workplace safety, labor relations, and workforce development policies and programs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b50ef1d48190b063aa342667df22 |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 3:06 p.m.