Triple

T21169937
Position Surface form Disambiguated ID Type / Status
Subject PeopleTools E521664 entity
Predicate instanceOf P0 FINISHED
Object runtime framework C34918 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: runtime framework
Context triple: [PeopleTools, instanceOf, runtime framework]
  • A. programming framework chosen
    A programming framework is a reusable, structured foundation of prewritten code, tools, and conventions that simplifies and standardizes the development of software applications.
  • B. production framework
    A production framework is a structured set of tools, processes, and guidelines that standardize and streamline the creation, deployment, and maintenance of products or services in a consistent, scalable way.
  • C. framework standard
    A framework standard is a high-level, structured set of principles, guidelines, and requirements that provides a common foundation for developing, implementing, and evaluating systems, processes, or practices across an organization or domain.
  • D. engineering framework
    An engineering framework is a structured set of principles, methods, and tools that guides the systematic design, development, and evaluation of engineering solutions.
  • E. cross-platform development framework
    A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50e30748190b186824a206d39b9 completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 3 p.m.