Triple

T21167216
Position Surface form Disambiguated ID Type / Status
Subject Green Line (CTA) main line E521596 entity
Predicate hasBranch P35 FINISHED
Object Green Line (CTA) Cottage Grove branch NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Green Line (CTA) Cottage Grove branch | Statement: [Green Line (CTA) main line, hasBranch, Green Line (CTA) Cottage Grove branch]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Green Line (CTA) Cottage Grove branch
Context triple: [Green Line (CTA) main line, hasBranch, Green Line (CTA) Cottage Grove branch]
  • A. Green Line (CTA) main line
    The Green Line (CTA) main line is a principal rapid transit route in Chicago’s 'L' system, running primarily along the South and West Sides and serving as a core corridor that branches to multiple termini.
  • B. Green Line Lake Street branch
    The Green Line Lake Street branch is a segment of Boston’s MBTA Green Line light rail system that runs primarily along Beacon Street and serves neighborhoods in Brookline and Boston.
  • C. Purple Line (CTA)
    The Purple Line (CTA) is a rapid transit route in Chicago primarily serving the northern suburbs and Evanston, with express service to downtown during weekday rush hours.
  • D. Orange Line (CTA)
    The Orange Line (CTA) is a rapid transit route in Chicago that connects the Loop with Midway International Airport and several Southwest Side neighborhoods.
  • E. IND 63rd Street Line
    The IND 63rd Street Line is a New York City Subway line in Manhattan and Queens that carries F and sometimes other services through the 63rd Street Tunnel.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Green Line (CTA) Cottage Grove branch
Target entity description: The Green Line (CTA) Cottage Grove branch is a segment of Chicago’s elevated rapid transit system that serves the city’s South Side, terminating near East 63rd Street and South Cottage Grove Avenue.
  • A. Green Line (CTA) main line chosen
    The Green Line (CTA) main line is a principal rapid transit route in Chicago’s 'L' system, running primarily along the South and West Sides and serving as a core corridor that branches to multiple termini.
  • B. Green Line Lake Street branch
    The Green Line Lake Street branch is a segment of Boston’s MBTA Green Line light rail system that runs primarily along Beacon Street and serves neighborhoods in Brookline and Boston.
  • C. Purple Line (CTA)
    The Purple Line (CTA) is a rapid transit route in Chicago primarily serving the northern suburbs and Evanston, with express service to downtown during weekday rush hours.
  • D. Orange Line (CTA)
    The Orange Line (CTA) is a rapid transit route in Chicago that connects the Loop with Midway International Airport and several Southwest Side neighborhoods.
  • E. IND 63rd Street Line
    The IND 63rd Street Line is a New York City Subway line in Manhattan and Queens that carries F and sometimes other services through the 63rd Street Tunnel.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50e30748190b186824a206d39b9 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e7270fce708190a5715b55b406dd4e completed April 21, 2026, 7:28 a.m.
Created at: April 16, 2026, 3 p.m.