Triple
T21161429
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oceaneering International |
E521448
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | subsea engineering company |
C34937
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: subsea engineering company Context triple: [Oceaneering International, instanceOf, subsea engineering company]
-
A.
subsea systems developer
A subsea systems developer designs, integrates, and maintains underwater technologies and infrastructure for offshore energy, research, and communication applications.
-
B.
deep-sea exploration company
A deep-sea exploration company is an organization that uses advanced marine technology and scientific research to discover, map, and study the ocean’s deepest environments for purposes such as resource assessment, environmental understanding, and technological innovation.
-
C.
offshore services company
An offshore services company is a business entity that provides specialized professional, financial, or operational services from a foreign jurisdiction, often to leverage regulatory, tax, or cost advantages for its clients.
-
D.
oil and gas services company
chosen
An oil and gas services company provides specialized technical, operational, and logistical support to exploration and production firms across the hydrocarbon value chain.
-
E.
offshore drilling contractor
An offshore drilling contractor is a specialized company that owns and operates offshore drilling rigs and related equipment to explore for and extract oil and gas beneath the seabed on behalf of energy producers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b50d1ea481909c07e63c3ead9316 |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 2:59 p.m.