Triple
T21130441
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sunita Williams |
E520669
|
entity |
| Predicate | spaceMission |
P68
|
FINISHED |
| Object | STS-117 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-117 | Statement: [Sunita Williams, spaceMission, STS-117]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-117 Context triple: [Sunita Williams, spaceMission, STS-117]
-
A.
STS-117
chosen
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
-
B.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
C.
STS-118
STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
-
D.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
E.
STS-116
STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b50b53048190ae34e8abbe3c5ada |
completed | April 16, 2026, 10:08 a.m. |
| NER | Named-entity recognition | batch_69e723556ec08190a2ade96c76f9cec7 |
completed | April 21, 2026, 7:12 a.m. |
Created at: April 16, 2026, 2:56 p.m.