Triple

T21057727
Position Surface form Disambiguated ID Type / Status
Subject Heron City shopping and entertainment complex E518763 entity
Predicate instanceOf P0 FINISHED
Object retail and leisure center C1524 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: retail and leisure center
Context triple: [Heron City shopping and entertainment complex, instanceOf, retail and leisure center]
  • A. shopping centre chosen
    A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
  • B. mixed-use lifestyle center
    A mixed-use lifestyle center is a planned development that combines retail, dining, entertainment, residential, and often office spaces in a walkable, open-air environment designed to create a vibrant, community-oriented destination.
  • C. convention center
    A convention center is a large, purpose-built facility designed to host conferences, trade shows, exhibitions, and other large-scale events, providing flexible meeting spaces and supporting services.
  • D. commercial park
    A commercial park is a planned area of land developed with multiple business facilities—such as offices, retail spaces, and light industrial units—designed to support commercial activities within a cohesive, often landscaped environment.
  • E. retail location
    A retail location is a physical or virtual place where goods or services are offered for sale directly to consumers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5053ac48190921529544959e906 completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 2:37 p.m.