Triple

T2105503
Position Surface form Disambiguated ID Type / Status
Subject Boston and Albany Railroad Highland branch E37184 entity
Predicate electrificationAfterConversion P5320 FINISHED
Object overhead catenary (light rail) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: overhead catenary (light rail) | Statement: [Boston and Albany Railroad Highland branch, electrificationAfterConversion, overhead catenary (light rail)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationAfterConversion
Context triple: [Boston and Albany Railroad Highland branch, electrificationAfterConversion, overhead catenary (light rail)]
  • A. electrificationCompleted
    Indicates that the process of providing electrical power infrastructure to the relevant entity or area has been fully completed.
  • B. electrificationSystem chosen
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • C. electrification
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • D. electrificationEnd
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • E. electrificationUsedBetween
    Indicates that an electrification system or method is applied or present along the segment or connection between two entities.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861828948190924aa30c08806b3a completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69abbadcd4a081909d60b9b241950335 completed March 7, 2026, 5:42 a.m.
PD Predicate disambiguation batch_69abb7b7b6288190afa11b4d93bd5666 completed March 7, 2026, 5:29 a.m.
Created at: March 4, 2026, 7:43 p.m.