Triple

T21052272
Position Surface form Disambiguated ID Type / Status
Subject La Cultura station E518616 entity
Predicate isPartOfCorridor P35 FINISHED
Object Villa El Salvador–Bayóvar corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Villa El Salvador–Bayóvar corridor | Statement: [La Cultura station, isPartOfCorridor, Villa El Salvador–Bayóvar corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Villa El Salvador–Bayóvar corridor
Context triple: [La Cultura station, isPartOfCorridor, Villa El Salvador–Bayóvar corridor]
  • A. Roma-Condesa corridor
    The Roma-Condesa corridor is a trendy, walkable area in central Mexico City known for its tree-lined streets, historic architecture, cafes, galleries, and vibrant nightlife.
  • B. Ortega Highway
    Ortega Highway is a scenic and winding mountain road in Southern California that connects Orange and Riverside counties through the Santa Ana Mountains.
  • C. Guadalajara–La Barca corridor
    The Guadalajara–La Barca corridor is a major transportation and economic axis in the Mexican state of Jalisco that links the metropolitan area of Guadalajara with the city of La Barca and surrounding municipalities.
  • D. Torres Maldonado Corridor
    Torres Maldonado Corridor is an architectural project by Preston Scott Cohen known for its complex geometric design and innovative spatial organization.
  • E. Carretera Central
    Carretera Central is a major Peruvian highway that connects Lima with the country’s central highlands and interior regions.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Villa El Salvador–Bayóvar corridor
Target entity description: The Villa El Salvador–Bayóvar corridor is the main Line 1 route of the Lima Metro in Peru, running in a north–south direction across the city and connecting multiple districts through a series of elevated stations.
  • A. Roma-Condesa corridor
    The Roma-Condesa corridor is a trendy, walkable area in central Mexico City known for its tree-lined streets, historic architecture, cafes, galleries, and vibrant nightlife.
  • B. Ortega Highway
    Ortega Highway is a scenic and winding mountain road in Southern California that connects Orange and Riverside counties through the Santa Ana Mountains.
  • C. Guadalajara–La Barca corridor
    The Guadalajara–La Barca corridor is a major transportation and economic axis in the Mexican state of Jalisco that links the metropolitan area of Guadalajara with the city of La Barca and surrounding municipalities.
  • D. Torres Maldonado Corridor
    Torres Maldonado Corridor is an architectural project by Preston Scott Cohen known for its complex geometric design and innovative spatial organization.
  • E. Carretera Central
    Carretera Central is a major Cuban highway that runs the length of the island, connecting key cities and provinces, including Pinar del Río.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b5053ac48190921529544959e906 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e6fd7cabe881909e6b258a14d501a6 completed April 21, 2026, 4:30 a.m.
Created at: April 16, 2026, 2:35 p.m.