Triple

T21043547
Position Surface form Disambiguated ID Type / Status
Subject Midfield Satellite Concourse E518389 entity
Predicate instanceOf P0 FINISHED
Object airport infrastructure project C44526 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: airport infrastructure project
Context triple: [Midfield Satellite Concourse, instanceOf, airport infrastructure project]
  • A. aviation infrastructure plan
    An aviation infrastructure plan is a strategic blueprint that outlines the development, expansion, maintenance, and integration of airport facilities, airspace systems, and supporting services to safely and efficiently meet current and future air transportation needs.
  • B. airport infrastructure funding program
    An airport infrastructure funding program is a structured initiative that allocates financial resources to plan, build, upgrade, and maintain airport facilities and related systems to ensure safe, efficient, and sustainable air transportation operations.
  • C. airport system
    An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
  • D. airport runway
    An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
  • E. Airport
    An airport is a complex transportation hub where aircraft take off, land, are serviced, and passengers and cargo transition between air and ground travel through various terminals and support facilities.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50438e08190917e2538bb8bc034 completed April 16, 2026, 10:08 a.m.
Created at: April 16, 2026, 2:19 p.m.