Triple

T21042994
Position Surface form Disambiguated ID Type / Status
Subject Soreang E518374 entity
Predicate hasTransportationLink P1298 FINISHED
Object Soreang–Pasir Koja Toll Road NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Soreang–Pasir Koja Toll Road | Statement: [Soreang, hasTransportationLink, Soreang–Pasir Koja Toll Road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Soreang–Pasir Koja Toll Road
Context triple: [Soreang, hasTransportationLink, Soreang–Pasir Koja Toll Road]
  • A. Trans-Sumatra Toll Road
    The Trans-Sumatra Toll Road is a major expressway network designed to connect key cities across Sumatra, boosting regional connectivity and economic development in Indonesia.
  • B. Trans-Java Toll Road
    The Trans-Java Toll Road is a major expressway network spanning the length of Java Island in Indonesia, designed to enhance connectivity, reduce travel time, and support economic growth across the island’s key cities and industrial regions.
  • C. Jakarta Outer Ring Road
    Jakarta Outer Ring Road is a major toll expressway encircling Jakarta, Indonesia, designed to alleviate inner-city traffic congestion and connect key urban and suburban areas.
  • D. Jakarta Inner Ring Road
    The Jakarta Inner Ring Road is a major toll expressway encircling central Jakarta, helping to distribute traffic between key districts including East Jakarta.
  • E. Pasir Gudang Highway
    Pasir Gudang Highway is a major roadway in Johor, Malaysia, that serves as a key route connecting the industrial town of Pasir Gudang with other parts of the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Soreang–Pasir Koja Toll Road
Target entity description: The Soreang–Pasir Koja Toll Road is a toll expressway in West Java, Indonesia, that connects the town of Soreang with the city of Bandung, improving regional accessibility and travel times.
  • A. Trans-Sumatra Toll Road
    The Trans-Sumatra Toll Road is a major expressway network designed to connect key cities across Sumatra, boosting regional connectivity and economic development in Indonesia.
  • B. Trans-Java Toll Road
    The Trans-Java Toll Road is a major expressway network spanning the length of Java Island in Indonesia, designed to enhance connectivity, reduce travel time, and support economic growth across the island’s key cities and industrial regions.
  • C. Jakarta Outer Ring Road
    Jakarta Outer Ring Road is a major toll expressway encircling Jakarta, Indonesia, designed to alleviate inner-city traffic congestion and connect key urban and suburban areas.
  • D. Jakarta Inner Ring Road
    The Jakarta Inner Ring Road is a major toll expressway encircling central Jakarta, helping to distribute traffic between key districts including East Jakarta.
  • E. Pasir Gudang Highway
    Pasir Gudang Highway is a major roadway in Johor, Malaysia, that serves as a key route connecting the industrial town of Pasir Gudang with other parts of the region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50438e08190917e2538bb8bc034 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e6fcf1950081908ff9fe8719e1e81b completed April 21, 2026, 4:28 a.m.
Created at: April 16, 2026, 2:17 p.m.