Triple
T21024613
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SL zone C |
E517906
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transport zone |
C42171
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transport zone Context triple: [SL zone C, instanceOf, transport zone]
-
A.
transition zone
A transition zone is a boundary region where two distinct systems, phases, or environments meet and gradually change into one another, exhibiting mixed or intermediate characteristics.
-
B.
commuter rail zone
A commuter rail zone is a designated geographic area used to determine fares, ticketing, and service boundaries for regional passenger rail travel.
-
C.
public transport region
chosen
A public transport region is a defined geographic area within which public transportation services are planned, coordinated, and managed as an integrated network.
-
D.
traffic plaza
A traffic plaza is a designed open area, often at an intersection or junction, that organizes and manages the flow of vehicles and pedestrians while sometimes providing public space amenities.
-
E.
tram station area
A tram station area is the designated zone surrounding a tram stop that includes platforms, tracks, passenger facilities, access paths, and related infrastructure supporting tram boarding, alighting, and circulation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b50262b081909bc488937145eb73 |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 1:55 p.m.