Triple

T21003388
Position Surface form Disambiguated ID Type / Status
Subject Joint Terrorism Task Force E517349 entity
Predicate alsoKnownAs P39 FINISHED
Object JTTF NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: JTTF | Statement: [Joint Terrorism Task Force, alsoKnownAs, JTTF]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: JTTF
Context triple: [Joint Terrorism Task Force, alsoKnownAs, JTTF]
  • A. JTTF chosen
    JTTF stands for Joint Terrorism Task Force, a collaborative multi-agency team in the United States that coordinates intelligence and law enforcement efforts to prevent and investigate terrorism-related activities.
  • B. JTFW
    JTFW is a U.S. military joint task force known as Joint Task Force West, typically organized to coordinate multi-service operations in a specific region or mission area.
  • C. JTFC
    JTFC is the abbreviation for Joint Task Force Central, a military formation responsible for coordinating and commanding joint operations within its designated area.
  • D. RJTF
    RJTF is the ICAO airport code assigned to Chōfu Airport, a regional airport serving the western Tokyo area in Japan.
  • E. JRTT
    JRTT is a Japanese government agency responsible for railway construction, transportation infrastructure development, and related technological advancement.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50192308190a284fcc89dd23a49 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e6fc3978b0819082b63a98962a673e completed April 21, 2026, 4:25 a.m.
Created at: April 16, 2026, 1:52 p.m.