Triple

T21002308
Position Surface form Disambiguated ID Type / Status
Subject Tumba station E517323 entity
Predicate locatedOn P40 FINISHED
Object Västra stambanan NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Västra stambanan | Statement: [Tumba station, locatedOn, Västra stambanan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Västra stambanan
Context triple: [Tumba station, locatedOn, Västra stambanan]
  • A. Västra stambanan chosen
    Västra stambanan is one of Sweden’s main railway lines, connecting Stockholm with Gothenburg and serving as a key corridor for both passenger and freight traffic.
  • B. Stångådalsbanan
    Stångådalsbanan is a regional railway line in southeastern Sweden that connects Linköping with coastal towns such as Västervik.
  • C. Bergslagen Line
    The Bergslagen Line is a Swedish railway route running through the historic Bergslagen mining and industrial region, connecting several towns in central Sweden.
  • D. Ostkustbanan railway line
    The Ostkustbanan railway line is a major Swedish rail route running along the country’s east coast, connecting Stockholm with northern regions and serving numerous municipalities along the way.
  • E. Värmland Line
    The Värmland Line is a railway route in western Sweden that connects key towns in Värmland County with the broader national and international rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b50192308190a284fcc89dd23a49 completed April 16, 2026, 10:08 a.m.
NER Named-entity recognition batch_69e6fc38b8688190860fba1b58e1b3e6 completed April 21, 2026, 4:25 a.m.
Created at: April 16, 2026, 1:52 p.m.