Triple

T2100088
Position Surface form Disambiguated ID Type / Status
Subject Third Assessment Report E37072 entity
Predicate endOfPublication P215 FINISHED
Object 2001 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2001 | Statement: [Third Assessment Report, endOfPublication, 2001]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: endOfPublication
Context triple: [Third Assessment Report, endOfPublication, 2001]
  • A. publicationCompleted
    Indicates that the process of publishing an item (such as a document, work, or release) has been fully finished and made officially available.
  • B. ceasedPublication chosen
    Indicates that an entity (such as a publication or series) has stopped being produced or released and is no longer ongoing.
  • C. isFinalArticleOf
    Indicates that one article is the concluding or last article within a defined sequence, series, or collection.
  • D. productionEnd
    Indicates that a production process, activity, or run has come to its completion or final stopping point.
  • E. closingSection
    Indicates that one entity serves as the concluding or final section of another entity (such as a document, event, or structured sequence).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861828948190924aa30c08806b3a completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69abbab9f5b88190b8a18056dc592dde completed March 7, 2026, 5:42 a.m.
PD Predicate disambiguation batch_69abb7b6274081909df36cd7a7c6a675 completed March 7, 2026, 5:29 a.m.
Created at: March 4, 2026, 7:43 p.m.