Triple
T21000647
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wey and Arun Canal (remnants) |
E517276
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | restored canal |
C21243
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: restored canal Context triple: [Wey and Arun Canal (remnants), instanceOf, restored canal]
-
A.
restored waterway
chosen
A restored waterway is a previously degraded or altered river, stream, or canal that has been rehabilitated to improve its ecological function, water quality, and surrounding habitat while often enhancing recreational and aesthetic values.
-
B.
former canal
A former canal is a disused or decommissioned artificial waterway that once facilitated transportation, irrigation, or drainage but no longer serves its original function.
-
C.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
D.
restored wetland
A restored wetland is a previously degraded or altered wetland area that has been intentionally rehabilitated to recover its natural hydrology, vegetation, and ecological functions.
-
E.
canal infrastructure
Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b5006e2881909fc2383f841740cc |
completed | April 16, 2026, 10:08 a.m. |
Created at: April 16, 2026, 1:52 p.m.