Triple

T20988027
Position Surface form Disambiguated ID Type / Status
Subject OKACOM E516942 entity
Predicate fullName P16 FINISHED
Object Permanent Okavango River Basin Water Commission NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Permanent Okavango River Basin Water Commission | Statement: [OKACOM, fullName, Permanent Okavango River Basin Water Commission]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Permanent Okavango River Basin Water Commission
Context triple: [OKACOM, fullName, Permanent Okavango River Basin Water Commission]
  • A. Permanent Okavango River Basin Water Commission chosen
    The Permanent Okavango River Basin Water Commission is a transboundary body established by the riparian states to coordinate the sustainable management and equitable use of the Okavango River Basin’s shared water resources.
  • B. Limpopo River Basin Commission (LIMCOM)
    The Limpopo River Basin Commission (LIMCOM) is a transboundary water management body established by the riparian states of the Limpopo River to coordinate cooperative governance, development, and protection of the basin’s shared water resources.
  • C. Zambezi Watercourse Commission
    The Zambezi Watercourse Commission is a regional intergovernmental body that coordinates the sustainable management and development of the Zambezi River’s shared water resources among its riparian states.
  • D. Technical Committee of the Zambezi Watercourse Commission
    The Technical Committee of the Zambezi Watercourse Commission is a specialized expert body that advises and supports the Commission in coordinating and managing the shared water resources of the Zambezi River Basin among its member states.
  • E. Council of Ministers of the Zambezi Watercourse Commission
    The Council of Ministers of the Zambezi Watercourse Commission is the high-level decision-making body composed of government ministers from member states that oversees and directs regional cooperation on the management and development of the Zambezi River basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ffac148190bbade9f0eceb660b completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6fbe5208c8190b8b843b3778589d3 completed April 21, 2026, 4:24 a.m.
Created at: April 16, 2026, 1:49 p.m.