Triple
T20983024
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Puerta de Jerez |
E516813
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Seville Metro station |
C44159
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Seville Metro station Context triple: [Puerta de Jerez, instanceOf, Seville Metro station]
-
A.
Madrid Metro station
A Madrid Metro station is a designated underground or surface facility where passengers access, board, and transfer between trains on the Madrid Metro network.
-
B.
Barcelona Metro station
A Barcelona Metro station is an underground or surface-level facility within the Barcelona rapid transit network where passengers access, board, and transfer between metro trains via platforms, ticketing areas, and related services.
-
C.
Tren Urbano station
A Tren Urbano station is a designated facility along the Tren Urbano rapid transit system where passengers access, board, and alight trains, typically featuring platforms, ticketing areas, and related transit amenities.
-
D.
Buenos Aires Underground station
A Buenos Aires Underground station is a designated facility within the city's subway network where trains stop to allow passengers to board, alight, and transfer between lines.
-
E.
Marseille Metro station
A Marseille Metro station is a designated public transit facility within the Marseille Metro network where trains stop to allow passengers to board, alight, and transfer between lines or other transport modes.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4ffac148190bbade9f0eceb660b |
completed | April 16, 2026, 10:07 a.m. |
Created at: April 16, 2026, 1:48 p.m.