Triple

T20982945
Position Surface form Disambiguated ID Type / Status
Subject Seville commuter rail E516810 entity
Predicate hasLine P35 FINISHED
Object C-1 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: C-1 | Statement: [Seville commuter rail, hasLine, C-1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: C-1
Context triple: [Seville commuter rail, hasLine, C-1]
  • A. C-1
    C-1 is a commuter rail line in the Cercanías Madrid network that connects central Madrid with its surrounding metropolitan areas.
  • B. C-1
    C-1 is the hull classification symbol identifying USS Boston as the first protected cruiser in the United States Navy’s “C” cruiser series.
  • C. C-2
    C-2 is a commuter rail line within the Cercanías Madrid network that connects central Madrid with its surrounding metropolitan areas.
  • D. C-3
    C-3 is one of the main commuter rail lines in the Cercanías Madrid network, connecting central Madrid with several southern suburbs and surrounding municipalities.
  • E. C-10
    C-10 is a commuter rail line within the Cercanías Madrid network that connects central Madrid with its surrounding metropolitan areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: C-1
Target entity description: C-1 is a line of the Seville commuter rail network that provides suburban passenger train service connecting Seville with its surrounding areas.
  • A. C-1
    C-1 is a commuter rail line in the Cercanías Madrid network that connects central Madrid with its surrounding metropolitan areas.
  • B. C-1
    C-1 is the hull classification symbol identifying USS Boston as the first protected cruiser in the United States Navy’s “C” cruiser series.
  • C. C-2
    C-2 is a commuter rail line within the Cercanías Madrid network that connects central Madrid with its surrounding metropolitan areas.
  • D. C-3
    C-3 is one of the main commuter rail lines in the Cercanías Madrid network, connecting central Madrid with several southern suburbs and surrounding municipalities.
  • E. C-10
    C-10 is a commuter rail line within the Cercanías Madrid network that connects central Madrid with its surrounding metropolitan areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ffac148190bbade9f0eceb660b completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6fbe03244819097630333e70c4e88 completed April 21, 2026, 4:24 a.m.
Created at: April 16, 2026, 1:48 p.m.