Triple

T20980747
Position Surface form Disambiguated ID Type / Status
Subject Nelaug E516753 entity
Predicate connectsRailwayLine P848 FINISHED
Object Arendal Line NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Arendal Line | Statement: [Nelaug, connectsRailwayLine, Arendal Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Arendal Line
Context triple: [Nelaug, connectsRailwayLine, Arendal Line]
  • A. Arendal Line chosen
    The Arendal Line is a Norwegian railway route that connects the coastal town of Arendal to the national rail network.
  • B. Solør Line
    Solør Line is a Norwegian railway line running through the Solør district in Innlandet county, historically important for both passenger and freight transport.
  • C. Vestfold Line
    The Vestfold Line is a key railway route in southeastern Norway that connects Oslo with towns along the western shore of the Oslofjord, serving as an important corridor for both passenger and regional traffic.
  • D. Kongsvinger Line
    The Kongsvinger Line is a Norwegian railway route running east from Oslo toward the Swedish border, serving both passenger and freight traffic.
  • E. Jæren Line
    The Jæren Line is a Norwegian railway route along the southwestern coast, primarily serving the Stavanger region with local and regional passenger traffic.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4ffac148190bbade9f0eceb660b completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e6fbdd89f48190b58c67cc1f7968c0 completed April 21, 2026, 4:23 a.m.
Created at: April 16, 2026, 1:47 p.m.